worldyellow1.jpg (42625 bytes)
Prevention Technologies, Inc.
Patented Process -- Below-Grade fill upgrade to At-Grade status
Below-Grade fill
Note the annular space that exposes surface
runoff and overfills to the environment.  On
average, this area is responsible for most of the
contamination in a station.
Specifications:
Esthetically pleasing
Contain all motor fuels
Installs without shutdown
Average install time:
< 2 hrs/fill
Step 1: Remove spill bucket cover
and prepare all surfaces.  Level with
fine gravel or course sand.
Fill - Bowl Formed.jpg (40008 bytes)
Step 2: Form a bowl that drains back into the
spill bucket using PTi Paste.
Mounting Lid.jpg (39962 bytes)
Step 3: Install a raised rim cover that
resists surface water runoff.
Fill Finished - 2.JPG (33476 bytes)
Step 4: Install new fill cover.
Contact:
Prevention Technologies, Inc.
1120 Abbey Court
Libertyville, IL 60048
Chuck Daul
Ph: 847-367-6964
email:
cmdmu@aol.com
Dave Lyzinski
Ph: 856-273-9700
email:
dlyzinski@verizon.net
Updated 2/24/07
Webmaster: D. Lyzinski
dlyzinski@verizon.net